As part of the survey, design, and engineering services for the 102 km long Çorum-Merzifon High-Speed Railway Line, the modeling of 11 tunnels with a total length of 14 km, including their entrance and exit portals, has been completed. Additionally, implementation projects for these tunnels have been prepared.
Çorum-Merzifon Railway Survey, Design, Engineering, and Consultancy Service Procurement Tunnel Projects
Çorum-Merzifon Railway Survey, Design, Engineering, and Consultancy Service Procurement Tunnel Projects

