İller Bank d) Abana Sewerage Final Project

İller Bank d) Abana Sewerage Final Project

The Abana (Kastamonu) Sewerage Final Project encompasses the systematic disposal of wastewater generated within the district boundaries and the resolution of stormwater issues in certain areas through a newly designed stormwater drainage network.

Within the scope of the project, wastewater collected from the network and collector lines in the residential area will be transported through pumping lines to a point where Ezine Creek flows into the sea. At this location, a deep-sea discharge system will be implemented to remove the wastewater.

The deep-sea discharge project for the Abana district was tendered by İller Bank A.Ş., and the design works have been successfully completed.