Süleymalı Road Survey and Project Consultancy Service Procurement Tunnel Projects

Süleymalı Road Survey and Project Consultancy Service Procurement Tunnel Projects

The (Kahramanmaraş-Göksun) Junction – Süleymanlı Provincial Road begins at the Suçatı Grade-Separated Junction on the Kahramanmaraş-Kayseri State Road with control section number D825-03 and ends in Süleymaniye Neighborhood, part of Onikişubat District. The route, with a control section number of 46-76, is currently operating as a 2×1 lane provincial road and has an approximate length of 21 kilometers.

Within the scope of this project:

•Definitive Geological and Geotechnical Study Reports were prepared for 6 tunnels.

•Calculation Reports for tunnel models were created.

•Entrance and exit portal analyses were conducted, and Portal Reports for the required support systems were prepared.

Additionally, geological-geotechnical, geotechnical, and superstructure reports related to the route were also completed.